Low Risk
The low-risk fieldwork process is intended for fieldwork where the level of risk is not expected to be elevated above that of a publicly managed space. The categorisation of low risk is defined in the risk sections.
Once the plan is created, and the risk level is set to 鈥榣ow鈥, the plan can be self-approved by checking the box shown below.